CONSULTATION
Welcome to the consultation page for the proposed turbine repowering and installation of a Battery Energy Storage System (BESS) at Cononsyth Farm, Angus, DD11 3SA.
Consultation Events
We are hosting two in-person public consultation events at Colliston Village Hall.
Event one: 25 August 2026, 3-7 pm
Event two: 14 September 2026, 3-7 pm
Event two: 14 September 2026, 3-7 pm
These events allow the local community to understand the proposal and ask any questions you may have.
What is the project?
The proposed development is a turbine repowering of an Enercon E33 with an Enercon E53 – and the installation of a BESS at Cononsyth Farm.
